We are pleased to announce we have been selected to design, manage, and build the new boiler house @ 2 Sisters site Derby.
The boiler house will include a roller shutter front, metal ventilated access door, extraction system either side of the new building and a metal clad system roof.
Works start 12/02/2018 and are planned to be complete and operational by 26/03/2018